fbpx

OFFICIAL FIIDO SELLER, ORIGINAL SPARE PARTS & EXPERT REPAIRING, CYCLESCHEME, CLICK n COLLECT, DEPOSIT & HOLD - Click to deposit / Register Your Bike / 📞 1 5340188

Recall Arrangement of Fiido X

” As of April 18, 2022, Fiido X recall reservation service is officially started. For all X users, please review the user protection plan as below, for the preferred exchange plan based on your needs. Please notice that, booking the free collection service for sending back the seat clamp and lug first, before choosing the exchange product, is needed. If there’s any questions or doubts with the recall arrangement, please do not hesitate to contact [email protected] Thank you for your support and understanding.

User Protection Plan

01. For users from IGG and Fiido website

Replacement Options

Replaced Product

Shipping Date

 

A. A new upgraded Fiido X

User will receive a update Fiido X(without seatpost battery and seat)

Upgraded Fiido X

It is estimated all the referred Fiido X will be ship out from the factory during June,25 2022 to July,10 2022.

B. An equal value Fiido E-bike

User could exchange for an equal value Fiido E-bike

For IGG Backer order amount below $1099

→ free replacement of D11 / M1pro

The shipment of the first batch from the factory will be arranged since June 1, 2022

For IGG Backer order amount of $1299

→ free replacement of D21

For order amount of $1599

→ free replacement of T1

C. For EU&US region, replace Fiido Ebike which are in stock + refund the difference

For users urgent for the bike, current models in overseas warehouses are available to choose.

L3 / D3Pro

The shipment from overseas warehouses will be arranged since April 25, 2022

Note:
1. We will provide all customers with free replacement according to the above product protection plan, all users are required to send back the seat clamp and lug of Fiido X, and fill in the tracking number on appointment page, to join the user protection plan. According to personal needs, every user can choose one replacement plan from the above replacement schemes to make an appointment. 2. All replacement will enjoy a new warranty period from the date of delivery. For details, please consult [email protected]

3. The updated Fiido X frame will come with an additional three-year warranty.

02. For user who purchased Fiido X from distributor

Please contact local authorized distributor.

How To Recall?

All users who received our recall email could make an appointment for free collection service by below steps:

- 01 -

Please remove the seat clamp and lug by following the below video instruction.

For users who have not received the products, please skip this step and make an appointment for product replacement directly, without booking a free collection service.

- 02 -

Booking a free collection service.

Make an appointment for a free collection service, send seat clamp and lug back to Fiido’s designated address.

- 03 -

Make an appointment for product replacement.

According to individual needs, choose one of the three replacement options to make an appointment.

+ Free collection appointment will close by May 10, 2022.
+ All the renewal or replacement must be submitted before May 31, 2022.

Attention

Recall only requires the seat clamp and lug removed from the effected Fiido X to be sent to Fiido’s required address. This is to prevent the old version of Fiido X from being used again in the future, result in secondary security risks.
 
Meanwhile, please reserve the seatpost battery for subsequent installation on the upgraded version of Fiido X. For efficient use of resources and environmental protection, users could store the remaining items as spare repair parts.

Step by Step to Disassemble

Please remove the seat clamp and lug by following the video instruction, if there’s any questions or doubts with removing, please do not hesitate to contact [email protected]

Upgrade plan for Fiido X frame V2

As of April 12, 2022, Fiido officially started the mold proofing and testing work based on the Fiido X frame upgrade program. The specific schedule is as follows:

– Product verification / Expected completion date: April 26, 2022, release the test report. (If the test is passed, the following work schedule will be promoted as plan; If the test fails, the following work schedule will be postponed for 15 days.)

– Mass Production / Estimated start time: April 27, 2022

– First shipment / Estimated shipping date: June 25, 2022